Scanning Foundation for Stability Before Equipment Installation

The Elliott Group is installing a Toshiba TMD-20 CNC machine. Weighing in at 61,730 lbs., the Toshiba TMD-20 needs a foundation 3 ft. thick. Before installing the foundation for the new machine, The Elliott Group had GPRS come in and scan the location prior to excavation. In the past when removing existing concrete, The Elliott Group found large air voids that they were not prepared for. Having GPRS in before any work was completed, they were able to know of any voids and conduits imbedded in the concrete.

For GPR projects or quotes in the Pittsburgh area or western Pennsylvania, contact Jacob Lammott at 412-292-3266, email jake.lammott@gp-radar.com, or visit www.gp-radar.com.